September Case Study: Toronto Waterfront Revitalization

Lura was initially retained in 2002 by Waterfront Toronto to design and lead the Corporation’s public consultation programs. Lura’s contribution included developing the overall strategic approach taken to community consultation by Waterfront Toronto as well as the Corporation’s public consultation policy. Over the past decade, Lura has worked closely with Waterfront Toronto and the City of Toronto to engage waterfront stakeholders and communities in over 20 waterfront revitalization projects.

Click here to read the full case study.